It started as a shaped dig in bare ground, held by curved shuttering, with a concrete footing and steel set around the edge.
The deck frame went in on concrete pads beside the water, with the timber bridge alongside. Slate edging, a stone waterfall and the deck boards followed, and the water went in.
View the project