New concrete floor
Bare ground, steel mesh, then a new concrete floor
Concrete floor
The room was stripped back to the old walls, with the ground underneath levelled and a pipe set in place.
Steel mesh went down across the whole room. The new concrete floor was then poured over it and smoothed out.
Want to know more about this job? Ask us.
From start to finish
Your job
Have a construction or cleaning job in mind?
Whatever the job, send us a photo or give us a call, in Jersey or in Spain.
- Certified
- Jersey and Spain
- Direct contact
Next project

01Before The pond dug out, its curved edge held by timber shuttering

02Mid project Steel deck frame on concrete pads, with the timber bridge ready to go in

03After Stone waterfall, timber bridge and deck, finished
Water gardenView the project